
Underground Production & Planning Engineer
Norton Gold Fields
Posted 16 days ago
RESIDENTIAL LOCATION: Kalgoorlie/Boulder
ROSTER: 8:6 (Residential or FIFO)
PACKAGE: Salary + Performance Bonus + Residential Allowance + Site Allowance + Family Private Health Insurance or Allowance + Death and TPD Coverage or Allowance + Mental Health Programs + Gym Membership Discount + Other Benefits
Why Norton Gold Fields
Norton Gold Fields is one of Australia’s largest domestic gold producers with mining and processing complex in Western Australia’s world-class Kalgoorlie Goldfields region. Currently, we are progressing development plans to develop a series of expansion projects in the region.
Our vision is to be the leading gold producer, setting the industry benchmark in safety, teamwork, innovation, operational efficiency, and cost control.
About the role
As an Underground Production & Planning Engineer at Norton Gold Fields PTY LTD, you will play a key role in driving the operational efficiency and strategic planning of the company's mining operations in Kalgoorlie, Western Australia. This full-time position is an excellent opportunity to apply your technical expertise and contribute to the ongoing success of this leading mining organisation.
What you'll be doing
Produce practical mine designs (including infrastructure and development required) to enable exploration of mining blocks over the LOM period.
Produce and maintain rolling production schedules.
Translate the long-term plan into a high quality, safe and executable short-term or mid-term schedule.
Drill and blast designs to support schedule targets.
Communicate with the Shift Supervisor, crew and technical staff on plans and issues.
Analyse and optimise ventilation systems.
Review applications of different mining methods and the impact on the economic viability of mining blocks and recommend changes as required.
Undertake rigorous economic evaluations of individual mining blocks.
Design development drives, stoping blocks, blast ring layouts and work plans are required.
Identify and set production priorities.
Complete reconciliations to measure and track design vs actual performance of designs.
What we're looking for
Tertiary Qualifications in Mining Engineering.
Current "C" Class Western Australian Driver's License (Manual).
Experience with mine design software - Deswik CAD and IS.
Proven track record in comparable role and operation (minimum 3 years) is essential.
Current Dangerous Goods Card (essential).
Mines Rescue experience (desirable)
Senior First Aid Certificate (desirable).
What we offer
Permanent full-time role with immediate start.
Excellent remuneration package with additional allowances.
Receive $12k residential allowance per annum.
Receive up to 10% short-term incentive payment (STIP) of your base salary.
Fully covered family private health insurance through GU Health Complete Gold Cover or an allowance of $4.8k.
Fully covered Death and Total & Permanent Disability (TPD) insurance.
Pro-rata long service leave (LSL) after just 5 years of service and be entitled to 13 weeks paid LSL after 10 years of service.
Opportunities for learning and development through various training programs provided by the company.
Work in a team with a growth mindset, ensuring you are able to bring out your best.
Apply Now
This can be your new beginning at a company that values its people and celebrates Diversity and Inclusion.
Norton is recognised as an Employer of Choice for Gender Equality by the Australian Government’s Workplace Gender Equality Agency. We are committed to providing equal opportunities and actively encourage applicants from all backgrounds to apply for our roles, regardless of gender, age, sexual orientation, ethnicity, religion, or disability.
About Norton Gold Fields
Norton Gold Fields Limited (Norton or “the Company”) is one of Australia’s largest domestic gold producers, with annual production of more than 178,000 ounces. The Company has a mining and processing complex in Western Australia’s world-class Kalgoorlie gold region, including a highly prospective tenement package of 1,092km² surrounding the 3.3Mtpa Paddington Mill.
Norton acquired the Bullabulling Gold Project near Coolgardie in 2014, including a series of granted mining leases, prospecting licences and exploration licences. Historically, Bulabulling was a near-surface open pit gold mining producer in the 1990's. Norton aims to review and advance the project towards production.
Norton has Mineral Resources of 10.35Moz, gold Ore Reserves of 1.11Moz and a mine life in excess of ten years, with considerable exploration upside from more than 80 known prospects across its tenement package.
Source: This is an extract from the company's own website.
Underground Mine Surveyor
Norton Gold Fields

Manufacturing Production Process
Australian Winders Pty Ltd
Production, Design and Sales Assistant
Talbot Walsh
Production Nursery Assistant
Frenchams Wholesale Nursery

Senior Completions Engineer
Brunel

Process Safety Engineer
Brunel

Subsea Installation Engineer
Brunel

Planning MICE Engineer
Brunel
